![](https://assets.fireside.fm/file/fireside-images/podcasts/images/3/3927e448-32cc-4bcf-8b2b-57d92cd5688d/episodes/3/37f3cabc-3106-45d8-ace2-609ad6360927/cover_medium.jpg?v=3)
February 24th, 2021 • 46 mins 49 secs • Download (28 MB) • Link with Timestamp
GBA has published over 100 case histories based on real-life events that have happened to geoprofessional firms. This episode in the series explores Case History #108, where a GBA-Member Firm provided suggested changes to a sewer pipe design in order to keep construction moving forward on a five-story senior-living facility. Four years later, swelling clays caused the sewer line to back-up and the lower-level slab began showing heaving related distress. That good deed with other project related complications resulted in a $25 million claim that required an extensive defense of contract limitations of liability, standards of care, and project documentation.