GBA Podcast

#108 - Case History - Out of Scope Assistance Causes Problem



February 24th, 2021  •  46 mins 49 secs  •  Download (28 MB)  •  Link with Timestamp

RSS Feed

GBA has published over 100 case histories based on real-life events that have happened to geoprofessional firms. This episode in the series explores Case History #108, where a GBA-Member Firm provided suggested changes to a sewer pipe design in order to keep construction moving forward on a five-story senior-living facility. Four years later, swelling clays caused the sewer line to back-up and the lower-level slab began showing heaving related distress. That good deed with other project related complications resulted in a $25 million claim that required an extensive defense of contract limitations of liability, standards of care, and project documentation.